Viewing the Progress by Lesson report in Imagine Language & Literacy

The Progress by Lesson report shows how your students are performing in each lesson in Imagine Language & Literacy and helps you interpret student performance across all lessons. The report includes data for all school years the students have been using the program, allowing you to track progress over time.

The report contains a section for each curriculum area—Literacy, Oral Vocabulary (i.e., Language), and Grammar. Almost all lesson types are included in the report, although two exceptions are the Conversational Phrases activities and the Listening Comprehension activities within Oral Vocabulary. 

The Progress by Lesson report shows:

  • where each student was initially placed in Imagine Language & Literacy and which lessons they skipped (tested out of)
  • which lesson groups (groups of 6-12 lessons) the student has already completed and whether they completed them this academic year or in prior years
  • the lesson group and grade level on which the student is currently working
  • a high-level list of the content in each lesson group
  • lesson details such as the time spent on each lesson and whether it was passed or completed

Administrators can view the report for any student in their organization, while Teachers can view the report for students in their own groups. Progress by Lesson reports update within an hour and are available at both the class and the individual student level.  

To view the Progress by Lesson report:

  1. Log in to Imagine Language & Literacy. 
  2. Select a group from the Home page.
  3. From the group's dashboard, click in to the Progress section.

    progress 8.6.24.png

  4. The Progress section defaults to the Progress by Lesson tab, and the class-level Progress by Lesson report opens defaulted to the Literacy curriculum area. You can also select Oral Vocabulary or Grammar.
    PBL select area.png
    When the Show Previous Years toggle is off, data will display in the report only for your current school year. 
    current school year.png

     Tip

    As shown highlighted in yellow below, empty cells to the left of the first fraction per row indicate that the lessons were completed in previous years.
    Empty cells to the right of the last fraction in a row are blank because the student has not yet started those lessons.
    blank cells Progress by Lesson report.png

    Turn the toggle on to include cumulative progress data from prior years. This will populate the cells to the left of the first fraction in each row.
    PBL step 4B.png
     

  5. Use the key at the top of the page to see which lesson groups students have completed, skipped, or have in progress. The legend is as follows:

    Symbol Description
    symbolA.png
    Gray arrow
    Indicates that the student has tested out of the lesson group. Students can test out of a lesson by showing proficiency on the Placement Test or another assessment for the skills taught in the lesson group. 

    SymbolC.png

    Blue checkmark

    Indicates that the student completed the lesson group during the current school year.  

    symbolB.png

    White checkmark

    Indicates that the student completed the lesson group in a previous school year. This symbol is only used when the Show Previous Years toggle is set to on.

    SymbolD.png

    Fraction

    Indicates the student's current placement in Imagine Language & Literacy for the selected curriculum area. The fraction compares the number of lessons completed and/or in progress to the total number of lessons available within that lesson group. It is not a reflection of accuracy.

    As an example, the number 5/6 means that the student has either completed the first 4 lessons in the group and is working on the 5th or has completed the first 5 lessons in the group and is about to start the 6th.

     Note

    Notesymbol.png In rare cases, you may see an additional symbol. A white and blue checkmark indicates that the student completed a portion of the lesson group in a previous school year and finished the lesson group in the current school year. This symbol is only used when the Show Previous Years toggle is set to on.

     Tip: Viewing a student's initial placement

    The first icon in each row that is not a gray arrow shows the student's initial placement. 

    Using Harlan as an example, we see that he initially placed into the beginning of the Grade 5 curriculum (because the gray arrows indicate that he skipped all previous lesson groups). He has completed lesson groups 1 and 2 for Grade 5 and is currently in or done with the 7th lesson out of 12 lessons in lesson group 3 for Grade 5.
    Step4.2.png
     

  6. For Kindergarten and Grades 1 and 2, hover over a Book Level to see the topics addressed within the books.
    step5.png
     
  7. Hover over a Lesson Group to see the curriculum. 
    hover progress by lesson.png
     
  8. Click on the Lesson Group to go to the page where you can preview its activities.
    step6.png
    A. The Lesson Guide opens in a new tab. Expand a section in the group to view a list of all the digital activities and their description.
    lesson group 3.png

     Note

    The number of activities in each lesson varies significantly, so the length of time it takes a student to complete a lesson varies accordingly. Given the same usage time, students with shorter lessons can be expected to complete up to twice as many lessons as their peers with longer lessons. 

    B. Hover over a thumbnail, click Play, and then click the pulsating blue and white Play button to play the activity. In this manner, you can view the exact activities your students receive.
    lesson group 3 2.png
     

  9. Click on an arrow, checkmark, or fraction to view details about student performance in each lesson group.
    step9.1.png
    The Lesson Details section opens:
    In remediation column 3.jpg

    The Lesson Details columns are as follows: 

    Column Description
    Curriculum area Literacy, Oral Vocabulary, or Grammar.
    Lesson title The name of the lesson.
    Last lesson activity The most recent date that the state of the lesson changed (i.e., the lesson was started, was completed, or was automatically paused by the Smart Sequencer™ to allow the student to work on a different lesson.)
    Time spent The total time in minutes and seconds that the student spent on the lesson. Time in a lesson can span more than one day or one week and can be interrupted by activities such as Benchmark assessments, Playlist activities, or lessons in another Curriculum Area. Therefore, time spent on a lesson may not directly correlate with daily or weekly usage minutes. 
    Remediation

    A symbol appears in this column if additional lessons were inserted into the student's learning path because the student did not master the lesson content the first time. Lessons can have up to 3 successive rounds of remediation where students revisit the same topic at delayed intervals. 

    • When a student has unfinished remediation activities to complete, the In Progress symbol (gray location marker) shows in this column. 
    • When a student has finished all available remediation, the white checkmark in a blue circle appears. The blue/white checkmark indicates completion of the remediation activities only; it does not necessarily mean that the activities were passed. (Look in the Outcome column to see if the lesson was passed.)
    Outcome

    This column indicates lesson performance or status.

    • A gray location marker displays in this column when the lesson is currently in progress.
       
    • A green checkmark displays in this column when students have passed the lesson. 

      "Passed" is defined as: 

      1. The student passed the base lesson on the first try. 
      --or--
      2. The student completed the base lesson AND the student completed and passed the remediation activities they were assigned for that lesson. 

      The passing rate for most activities in Imagine Language & Literacy is 70%, but this can vary.
       
    • A gray arrow displays in this column when a student has skipped (i.e., automatically tested out of) a lesson. 

     Note

    No information displays for tested-out lessons in the Skills Inventory report.

    • A red X means the student did not pass the lesson.

     Recommendation

    Check the Action Areas Tool for more ideas on how to assist students with unfinished learning.

  10. If desired, export the report to a CSV file and/or print it. The download and printer icons are in the top right. The files will contain the data you see on your screen, so be sure to set your Curriculum Area and the Show Previous Years toggle accordingly.
    PBL print and export.png
    In the downloaded CSV file, the following abbreviations are used:

    • C = Completed
    • LG = Lesson Group
    • T= Tested Out

     Tip

    After viewing the class-level report Literacy, change the Curriculum Area drop-down menu and look at the report for Oral Vocabulary and then Grammar. You must print and export each Curriculum Area separately.

    Oral Vocabulary:
    PBL Oral Vocab.png
    Grammar:
    PBL Grammar.png

     

  11. Click on a student's name to view the student-level Progress by Lesson report.
    PBL step 12.png
     
  12. The top section of the student-level report displays information for all 3 curriculum areas in the same view. Click into the Lesson Groups, arrows, checkmarks, and fractions as you would for the class-level report. You'll also have the Show Previous Years toggle and a print button in the top right. The student-level report prints all 3 curriculum areas on the same page.
    PBL step 13.png
  13. The bottom section of the student-level report defaults to show all lesson details. If desired, use the Filter by drop-down menu to narrow the results to the criterion you specify. See step 9 above for an explanation of the data in this table.
    PBL step 14.png

    You can also change the number of items that display per page—the default is 10, but you can change it to view up to 200 results at once.
  14. Use the arrows at the top of the page to navigate to another student's Progress by Lesson report.
    PBL step 15.png

 Recommended Next Steps